My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-02-10_GENERAL DOCUMENTS - C1981017 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1992-02-10_GENERAL DOCUMENTS - C1981017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 9:22:06 AM
Creation date
6/14/2012 9:08:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/10/1992
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Candace Thompson <br /> Re: Coal Basin Mines - Subsidence <br /> page 3 <br /> Dr. Collins requests, in his October 25, 1988 letter report, that "resumption <br /> of the monitoring program be limited to annual visual inspection and <br /> reporting". He observes that no structures or renewable resource lands are in <br /> jeopardy from the ridge-line landslide. Because all of the potentially <br /> affected area lies within the existing Permit boundary and no structures or <br /> renewable resource lands are in jeopardy, the Division believes that a <br /> subsidence monitoring program limited to annual visual inspection of the <br /> potentially affected area and submission of a report is adequate. However, <br /> prior to the conduct of double-pass longwall extraction or consideration of <br /> any future requests for amendment of the mine plan which involved expansion of <br /> the potentially subsided area, the Division will require the operator to <br /> revise the subsidence report submitted in December, 1985 to reflect the 1988 <br /> subsidence resurvey data. <br /> Compliance with Stipulation (2 ) <br /> In accordance with revision stipulation (2 ), the monuments have been <br /> maintained, as evidenced by their use in the completion of the Fall of 1988 <br /> subsidence resurvey. <br /> Compliance with Stipulation (3) <br /> The permit in effect at the issuance of that revision approval expires in <br /> 1988. In accordance with revision stipulation (3), MCR performed a resurvey <br /> of the twenty subsidence monuments in September of 1988. MCR submitted a <br /> letter report, dated Sept mber 26, 1988, tabulating the survey data gathered <br /> during the 1988 subsidenc monument survey. The data demonstrates that many <br /> of the monuments experien ed significant residual vertical subsidence <br /> following the 1985 subsid nce monument survey. For purposes of comparison the <br /> Division briefly revised he determination of subsidence factor contained in <br /> Dr. Collins' 1985 report o reflect the Fall of 1988 total vertical subsidence <br /> data. The following is a partial revision of Table 2 from that report. <br /> CALCULATED SUBSIDENCE RATIOS <br /> (Revision of Table 2 - December 1985 Report by Dr. Collins ) <br /> Point Total Total Coal Subsidence <br /> Number Subsidence Removed Ratio <br /> TP-1 -2.41 9.00' 0.27 <br /> TP-2 - 0 - <br /> TP-3 - 0 - <br /> TP-4 -0.81 ' 8.00' 0.10 <br /> TP-5 -1 .74' 15.00' 0.12 <br /> TP-6 -3.50' 10.00' 0.36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.