My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-13_INSPECTION - C2010088
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C2010088
>
2012-06-13_INSPECTION - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:00:02 PM
Creation date
6/14/2012 8:24:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Inspection
Doc Date
6/13/2012
Doc Name
Inspection Report
From
DRMS
To
Jim Stover
Inspection Date
6/5/2012
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 5, 2012 C- 2010 - 088 / Fruita Loadout MPB <br />Inspection Topic Summary <br />NOTE: Y= Inspected N =Not Inspected R= Comments Noted V= Violation Issued NA =Not Applicable <br />NA -Air Resource Protection <br />NA - Roads <br />N - Availability of Records <br />NA - Reclamation Success <br />NA - Backfill & Grading <br />NA - Revegetation <br />NA - Excess Spoil and Dev. Waste <br />NA - Subsidence <br />NA - Explosives <br />NA - Slides and Other Damage <br />N - Fish & Wildlife <br />NA - Support Facilities On -site <br />Y - Hydrologic Balance <br />NA - Signs and Markers <br />NA - Gen. Compliance With Mine Plan <br />NA - Support Facilities Not On -site <br />R -Other <br />NA - Special Categories Of Mining <br />NA - Processing Waste <br />NA - Topsoil <br />COMMENTS <br />INTRODUCTION: <br />This was a partial inspection of the Fruita Loadout conducted by Mike Boulay of the Division of Reclamation, <br />Mining and Safety on June 5, 2012. There was no operator /representative from CAM Colorado LLC present <br />during the inspection. Weather conditions were warm, clear and dry. Ground conditions were dry. <br />OTHER: <br />The permit was issued on March 6, 2012 but the operator has not yet begun construction of any of the planned <br />facilities. There was no activity at the site during this inspection and the site remains undisturbed by the loadout <br />operations. <br />DOCUMENTS RECEIVED <br />None <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: I <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.