Laserfiche WebLink
Mr. Jim Herron December 30, 1983 Page 3 <br /> 019 (39136-001) TRAIN 0. 15 ACRES . This pond is designed to be <br /> dug out immediately following any significant storm event and/or <br /> spring runoff , so it maintains its maximum capaciaty at all times. <br /> SUMMARY <br /> The following ponds as they were being cleaned were enlarged and <br /> will be re-surveyed in 1984 : <br /> 006 Refuse S <br /> 008 Garage <br /> 011 Savage (M.K. ) <br /> The warehouse pond 010 will be enlarged and re-surveyed in 184 . <br /> I hereby certify that to the best of my knowledge, the acre- <br /> ages in this report are a true and accurate representation of the <br /> actual sizes; and that the construction methods used were as <br /> designed. <br /> Yours very truly, <br /> Vice President <br /> JHTurner :ms <br />