My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (200)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (200)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:19:46 AM
Creation date
6/13/2012 11:08:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 MOBILIZATION/DEMOBILIZATION <br /> 1.1 DESCRIPTION <br /> This specification covers the CONTRACTOR'S operations for: <br /> a. Payment of premiums for bonds and insurance acquired specifically for the <br /> construction of this project, including premiums for performance and payment <br /> bonds; <br /> b. Movement of personnel, equipment, operation supplies, and incidentals to the <br /> project site; <br /> C. Establishment of office, buildings, and other necessary temporary facilities at the <br /> project site; <br /> d. Preparatory work at the construction site; and, <br /> e. All temporary barricades or fencing used to safeguard mine openings during <br /> construction. Any shafts which were fenced prior to construction, or other <br /> openings designated by the Principle Representative, shall be protected by a <br /> temporary fence during non-working hours. <br /> f. Demobilization of CONTRACTOR'S equipment and all other facilities, final project <br /> clean-up, and for all other work for which payment is not otherwise provided for <br /> under the contract. <br /> The temporary facilities may include, but not be limited to the following: <br /> a. Workshops, offices, storage yards, and construction plant and equipment <br /> including spare parts, fuels, and oil; <br /> b. Sanitation facilities, communication facilities, and sprinkler trucks; <br /> C. Contractor's electrical power system; and, <br /> d. Other items such as water, compressed air, etc., not specifically listed but <br /> required for the functioning of construction activities. <br /> 1.2 EXECUTION <br /> Mobilization <br /> Upon receipt of the Notice to Proceed, the CONTRACTOR shall furnish, mobilize, move in, and <br /> install such temporary works and equipment as are necessary for the successful completion of <br /> the work. The CONTRACTOR shall also operate and maintain such temporary works, <br /> equipment and construction plant throughout the period of construction. All applicable <br /> temporary works, such as sanitation facilities, shall fully comply with all rules and regulations. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.