My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-02-19_GENERAL DOCUMENTS - C1981017 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1999-02-19_GENERAL DOCUMENTS - C1981017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2021 7:57:43 AM
Creation date
6/13/2012 11:07:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/19/1999
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT. 2 '98 8:01AM DMG,GJCT 1 303 2410336 P.2 <br /> STATE OF COLORADO- <br /> nIVISION OF MINERALS AND GFOI.OGY w � W <br /> ks <br /> I?oisrrUrn nl of Nawril kcsuurc.cs <br /> I !1 )Slwrrimn 51„ Room 215 <br /> [)(-1*1Ve1,Colou'do 80203 <br /> DEPARTMENT OF <br /> OCT 13 1998 NATURAL <br /> October 2, 1998 RESOURCES <br /> Ml✓MO <br /> Division Ot Minerals&Geology Roy Romer <br /> IMP <br /> Goy ernor <br /> lames S.Lochhead <br /> TO: Sue Griswold, Purchasing r=,-c mivr,nirnrrnr <br /> Michael B.Long <br /> - Division Director <br /> FROM: Steve Renner, Minerals and Geology <br /> RE; Clwnge Order. Coal Basin/Dutch Creek Diversion Bid Numbcr PKA-9-424 <br /> Minerals and Geology requests permission to issue a change order to the above named project. <br /> The change order will exceed the bid price by over twenty percent. <br /> Completion of the Dutch Creek Diversion will result in construction of a large stream channel <br /> which will isolate a portion of the Coal Basin Mine. It is necessary to import topsoil to the <br /> isolated portion of the mine site in order to complete reclamation at that location. The topsoil <br /> should be imported to the area prior to completion of the diversion channel in order to take <br /> advantage of existing access. Upon completion of the diversion, access will become very <br /> difficult, resulting in higher transportation costs. <br /> Approxiluately 7,120 cubic yards of topsoil will be hauled and stockpiled to the cast side of the <br /> diversion prior to loss of access. The total cost will be approximately $21,000- This equates to <br /> $2.95 per cubic yard, which is competitive with estimates quoted by other contractors. Sufficient <br /> fiords are available to complete this work. <br /> Please contact me at (970) 250-5478 if you have questions regarding this cque t. <br /> c <br /> I <br /> cc: Yvonne Brannon <br /> Jim McArdle '� <br />
The URL can be used to link to this page
Your browser does not support the video tag.