Laserfiche WebLink
':CT. c ?0 8 t 01i M DMG,G.TCT 1 3-e-Z ?4i02-2F Z <br /> P <br /> ,r <br /> -- 5TATE OF COLORADO-- <br /> DIVISION OF MINERALS AND GFOLO(;Y <br /> I)nu.,rwivnl of N.uural ke%ourccs <br /> rman St., 'Zooid 215 PWIF7 W' —, <br /> (1„h.r:ci,)8o7ni ] <br /> fnX !u;13"-SICb <br /> nEPARTVLEN7 OF <br /> OCT la NATURAL <br /> October 2. 1998 � I` RESOURCES <br /> DlVlslen of <br /> MB��10 ti9inerals �:e01C9Y Ruv Romer <br /> !Ib1P Go%emar <br /> {dmcs S.Lochneac <br /> TO: Sue Griswold. Purchasing rX 11hVP 7irnew <br /> Michacl8 Lon, <br /> FROM: Steve Renner, Minerals and Geology Division Director <br /> RE: Clwuge Ordcr. Cuul Busin/Dutch Creek Diversion Bid Number PKA-9-424 <br /> Minerals and Geology requests permission to issue a change order to the above named prgject. <br /> The change order will exceed the bid price by over twenty pc-rccnt. <br /> Completion of the Dutch Crock Diversion will result in construction of a large stream channel <br /> which will isolate a portion of the Coal Basin Mine. It is necessary to import topsoil to the <br /> isolated portion of the mine site in order to complete reclamation at that location. The topsoil <br /> should be imported to the area prior to completion of the diversion channel in order to take <br /> advantage of existing access. Upon completion of the diversion, access will become very <br /> difficult, resulting in higher transportation costs. <br /> Approgituately 7,120 cubic yards of topsoil will be hauled and stockpiled to the cast side of the <br /> diversion prior to loss of access. The total cost will be approximately $2I,000- This equates to <br /> $2.95 per cubic yard, which is competitive with estimates quoted by other contractors. Sufficient <br /> binds are available to complete this work. <br /> Please contact me at (970) 250-5478 if you have questions regarding this quc t. <br /> c <br /> Ir <br /> cc: Yvonne Brannon <br /> Jim McArdlc J �� <br /> I <br />