Laserfiche WebLink
GENERAL BID SPECIFICATIONS <br /> The Colorado Inactive Mine Reclamation Program General Bid Specifications 1996, which <br /> include General Conditions, Standard Work Specifications, and Standard Drawings and Figures <br /> are intended to complement these Special Conditions. The Special Conditions combined with <br /> the General Bid Specifications 1996form the complete Invitation and Bid document. Please <br /> refer to the Standard Work Specifications for all applicable types of work required in the Special <br /> Conditions. The General Conditions apply to all work covered in the Special Conditions. Copies <br /> of the General Bid Specifications are available from the Division of Minerals and Geology <br /> (DMG), 1313 Sherman Street, Room 215, Denver, Colorado 80203 (303) 866-3567. <br /> PROJECT DATES <br /> The project is scheduled for construction between July 22, 1998, and October 14, 1998. This <br /> includes ten (10) days mobilization time. <br /> TIME OF COMPLETION <br /> The time of completion allowed for the project is eighty four(84) calendar days after receipt of <br /> the Notice to Proceed. This includes ten (10) days mobilization time. <br /> LIQUIDATED DAMAGES <br /> The liquidated damages for this project will be $400.00 per day. Please see General Conditions, <br /> Articles 34, 35 and 40. <br /> NOTICE OF AWARD AND EXECUTION OF DOCUMENTS <br /> A Notice of Award will be sent to the apparent low bidder within four(4) days of the bid opening. <br /> The contract signing date and time will be set for fourteen (14) days after the bid opening. The <br /> Division of Minerals and Geology must receive the following: <br /> (a) Executed Agreement; <br /> (b) Fully-executed Performance and Payment Bonds, accompanied by <br /> appropriate Power of Attorney, effectively dated; <br /> (c) Certificates of Insurance showing proof of required coverage and <br /> Additional Insured Endorsement; <br /> (d) Project schedule; <br /> (e) AML Contractor Ownership and Control Form•, <br /> (f) Minority(MBE)/women (WBE) Business Participation form; <br /> (g) Three-Way Agreement for Reclamation Activities, if required by the <br /> Special Conditions; <br /> (h) A list of all subcontractors to be used on the project, the work tasks and <br /> dollar value to be subcontracted to each, and <br /> (h) Completed W-9 forms, if required (for contractors new to the State). <br /> Please consult Articles 2-7 of the General Conditions. <br /> If the above documents are not submitted properly by the contract signing date, the Division of <br /> 4 <br />