Laserfiche WebLink
3 <br /> BID SCHEDULE 3 °i <br /> COAL BASIN MINE / HUNTSMAN PROJECT <br /> PKA-8- <br /> ITEM DESCRIPTION QTY. UNIT UNIT PRICE AMOUNT <br /> Mobilization/ <br /> Demobilization per <br /> 1 specifications 1 Job N/A $ <br /> Earth Work, per N/A <br /> 2 specifications 1 Job $ <br /> Topsoil Placement, N/A <br /> 3 per specifications 1 Job �I 57 p <br /> Revegetation, per <br /> 4 specifications 12 Acre $ <br /> Equipment Rental, <br /> 5 (if required) <br /> Bulldozer, per <br /> A specifications 24 Hour $ P $ f (� <br /> Backhoe/ Loader, <br /> B per specifications 24 Hour $ 9 <br /> End Dump Truck, <br /> C per specifications 30 Hour $ S <br /> Silt Fence, 1, <br /> 6 Installed 1,500 Ln. Ft. $ <br /> Underdrain <br /> Construction, <br /> Installed (if 3 v <br /> 7 required) 75 Ln. Ft. $ <br /> Tree, Shrub <br /> Planting, per <br /> 8 specifications 15 Acre I $ <br /> GRAND TOTAL (Enter here and on Invitation and Bid Sheet) <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page I of I Page Z- <br /> 1 <br /> � d <br /> G � r/t <br /> 1 <br /> y <br />