Laserfiche WebLink
BID SCHEDULE <br /> COAL BASIN MINE/HUNTSMAN PROJECT <br /> P KA-8-417 <br /> ITEM DESCRIPTION OTY. UNIT UNIT PRICE AMOUNT <br /> 1 Mobilization/Demobilization <br /> per specifications 1 Job N/A $ <br /> 2 Earth Work, per <br /> specifications 1 Job N/A $ <br /> 3 Topsoil Placement, per <br /> specifications 1 Job N/A $ <br /> 4 Revegetation, per <br /> specifications 12 Acre $ $ <br /> 5 Equipment Rental, <br /> (if required) <br /> A Bulldozer, per specifications 24 Hour $ $ <br /> B Backhoe/Loader, per <br /> specifications 24 Hour $ $ <br /> C End Dump Truck, per <br /> specifications 30 Hour $ $ <br /> 6 Silt Fence, Installed 1,500 Ln Ft. $ $ <br /> 7 Underdrain Construction, <br /> Installed (if required) 75 Ln Ft. $ $ <br /> 8 Tree, Shrub Planting, per <br /> specifications 15 Acre $ $ <br /> GRAND TOTAL (Enter here and on Invitation and Bid Sheet) $ <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />