My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-06-19_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1998-06-19_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 8:01:07 PM
Creation date
6/13/2012 10:39:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
6/19/1998
Doc Name
Bid Documents (IMP) PKA 8-417
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Measurement and Payment <br /> There will be no measurement for payment. Payment for this task will be reflected in a lump <br /> sum bid under Item 3 on the Bid Schedule. This lump sum bid will cover all costs for removal of <br /> stockpiled topsoil, distribution of topsoil onto the affected areas of the Old Refuse Pile, creation <br /> of soil hummocks, and grading of the topsoil stockpile footprint. Such payment shall be <br /> considered full compensation for all labor, materials, equipment and all other items necessary <br /> and incidental to the placement of topsoil as directed and described in the specifications. <br /> Payment for this task will be made only for the unit price shown under Item 3 of the Bid <br /> Schedule. Payment shall be as this task is completed and approved by the PROJECT <br /> MANAGER. <br /> TASK 4 REVEGETATION <br /> All areas disturbed during reclamation work and any other areas specified in these Special <br /> Conditions will be revegetated according to the Revegetation Specifications in the General Bid <br /> Specifications. Commercial fertilizer is required for this project, and will be supplied by <br /> CONTRACTOR. Seed will be supplied by the OWNER. <br /> All areas disturbed during reclamation work and any other areas specified in these Special <br /> Conditions will be revegetated according to the Revegetation Specifications in the General Bid <br /> Specifications Section 20.0, except as modified by these Special Conditions. All areas will be <br /> seeded with the "Mine Site Seed Mixture", (Table 1). <br /> Due to site conditions, no revegetation efforts may be initiated prior to September 14, 1998. <br /> In addition to the revegetation specifications outlined in Section 20.0, attached, the following <br /> requirements will be adhered to: <br /> Seed <br /> Seed will be provided by the OWNER. The CONTRACTOR must give the PROJECT <br /> MANAGER at least ten (10) working days notice of the acreage to be seeded, so that the proper <br /> amount of seed is delivered. Hand written acreage calculations are acceptable. <br /> Fertilizers <br /> Commercial fertilizer is required for this project. Fertilizer shall be provided by the <br /> CONTRACTOR, and shall conform to Section 20.2 (commercial fertilizer) of the Revegetation <br /> Specifications, attached. <br /> Seedbed Preparation <br /> Seedbed preparation is required, and shall be accomplished as described in Section 20.3 of the <br /> Revegetation Specifications, attached. <br /> Mulches <br /> Mulching is required for this project. Mulch shall be provided by the CONTRACTOR, and shall <br /> conform to Section 20.2 of the Revegetation Specifications, attached. All mulch shall be <br /> certified as noxious weed free or noxious weed seed free by any authorized State or County <br /> Officer. Documentation of certification shall be provided to the PROJECT MANAGER prior to <br /> application of mulch. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.