Laserfiche WebLink
Item <br />Description <br />Qty. <br />Unit <br />Unit Price <br />Amount <br />1 <br />Mobilization/ Demobilization per <br />specifications <br />1 <br />Job <br />N/A <br />$ <br />2 <br />Demolition, per specifications <br />1 <br />Job <br />N/A <br />$ <br />3 <br />Silt fence, installed <br />800 <br />Ln. Ft. <br />$ <br />$ <br />4 <br />Equipment Rental (if required) <br />a <br />Bulldozer, per specifications <br />40 <br />Hours <br />$ <br />$ <br />b <br />Backhoe Loader, per <br />specifirTitions <br />20 <br />Hours <br />$ <br />$ <br />BID SCHEDULE <br />WASH PLANT AREA DEMOLITION PROJECT <br />PICA-8-404 <br />GRAND TOTAL (Enter here and on Invitation and Bid Sheet) <br />THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br />Page 1 of 1 Page <br />