Laserfiche WebLink
Item <br />Description <br />Qty. <br />Unit <br />Unit Price <br />Amount <br />1 <br />Mobilization/ <br />Demobilization <br />per <br />specifications <br />1 <br />Job <br />N/A <br />$/9., Soo.00 <br />2 <br />Demolition, per <br />specifications <br />1 <br />Job <br />N/A <br />$ <br />3 <br />Silt Fence, <br />installed <br />800 <br />Ln. Ft. <br />$ - <br />$ 3.2-00.0(} <br />4 <br />Equipment <br />Rental (if <br />required) <br />4a <br />Bulldozer, per <br />specifications <br />40 <br />Hours <br />$ 95.(x) <br />$ Z. $'00.00 <br />4b <br />Backhoe Loader, <br />per <br />specifications <br />20 <br />Hours <br />$t'.5 <br />$ /, DOD .60 <br />Item <br />Description <br />Qty. <br />Unit <br />Unit Price <br />Amount <br />5 <br />Additional <br />Demolition <br />1 <br />Cubic <br />Yard <br />$ 30_ <br />$ 30.6D <br />REVISED BID SCHEDULE <br />WASH PLANT AREA DEMOLITION PROJECT <br />PKA -8 -404 <br />GRAND TOTAL (Enter here and on Invitation and Bid Sheet) <br />