Laserfiche WebLink
Item <br />Description <br />Qty. <br />Unit <br />Unit Price <br />Amount <br />1 <br />Mobilization/ <br />Demobilization <br />per <br />specifications <br />1 <br />Job <br />NJA <br />$ 18 IVL <br />2 <br />Demolition, per <br />specifications <br />1 <br />Job <br />N/A <br />$ 10,2, Soo.' <br />3 <br />Silt Fence, <br />installed <br />800 <br />Ln. Ft. <br />$ 1s <br />$ 86a <br />4 <br />Equipment <br />Rental (if <br />required) <br />4a <br />Bulldozer, per <br />specifications <br />40 <br />Hours <br />$ 10.� <br />$ (ppb0. <br />4b <br />Backhoe Loader, <br />per <br />specifications <br />20 <br />Hours <br />$ (c/40. <br />$ 1 G`.�. <br />Item <br />Description <br />Qty. <br />Unit <br />Unit Price <br />Amount <br />5 <br />Additional <br />Demolition <br />1 <br />Cubic <br />Yard <br />$ IU. <br />$ ID. m, <br />REVISED BID SCHEDULE <br />WASH PLANT AREA DEMOLITION PROJECT <br />PKA -8 -404 <br />GRAND T O T A L ( Enter here and on Invitation and Bid Sh pt ) <br />