My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (198)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (198)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:14:35 AM
Creation date
6/13/2012 10:32:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demobilization <br /> Upon completion of the work under this Contract, the CONTRACTOR shall remove all <br /> temporary facilities and equipment. The CONTRACTOR shall remove from the work site <br /> all rubbish, unused materials, and shall fill and dress all holes and disturbances made <br /> for convenience, and leave all areas in good order and condition, subject to the approval <br /> of the PROJECT MANAGER. <br /> 1.3 MEASUREMENT AND PAYMENT <br /> No measurement for payment shall be made for mobilization and demobilization. <br /> Payment of two-thirds of the lump sum price bid will be made with the first monthly <br /> progress payment after completion of the work described above for mobilization. <br /> Payment of one-third of the lump-sum price bid will be made with the final progress <br /> payment for the work if demobilization has been completed. If the price bid for <br /> mobilization and demobilization is greater than 15 percent (15%) of the total contract <br /> price, invoices supporting the mobilization costs will be required before payment is <br /> approved. <br /> Remobilization <br /> If remobilization becomes necessary due to seasonal conditions beyond the <br /> CONTRACTOR'S control, remobilization costs will be paid based on documented actual <br /> costs. No remobilization payment will be made if delays necessitating remobilization <br /> were the CONTRACTOR'S responsibility. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.