Laserfiche WebLink
03/18/99 11:10 FAX 970 858 4331 DIRT-N-IRON,- , Z002 <br /> COAL BASIN11999 RUN-OFF MAINTENANCE <br /> BID SCHEDULE <br /> PKA-9-1061 <br /> Item Description <br /> Q��T�'d Unit Price <br /> Total Cost <br /> 1 total units) <br /> 137H Dozert215 FHP equivalent w/operator <br /> including m0b/demob <br /> s $--�s�h,r $ l3ao. op1a D7H Dazer/215 FHP <br /> equivalent w/operator 24 <br /> 2 4168 b $ '6Q-0O /hr/loader or 62 FHP equivalent <br /> "OoPera'o including mob/demob <br /> 8 $ 70--- <br /> 4168 hackhoe/i�def or 62 FHp equivalent w/operator <br /> 2a y�.o0 <br /> 3 10 cubic yard on&ff highway dump truck $ r $ 10 OCR <br /> w/operator including mob/demob <br /> 8 $ 50. bo Mr 4100-QO <br /> 10 cubic yard on/off highway dump truck <br /> w/operator _ <br /> 4 12G motor 8 $��•00 Mr $ "T QQ.LSO <br /> grader or 135 FHP equivalent <br /> w/opendor including mob/demob <br /> - s $ 75.60 mr $ 6ca Qp <br /> 4a 12G motor grader or 135 FHP equivalent <br /> w/operator <br /> $ r 5 Prefabricated silt fence <br /> per fug foot installed 16 �4,00 M $ 9(QQ_00 <br /> Including m� ob <br /> 5a Prefabricated silt fence per lineal foot installed <br /> Straw Bales with n3bar per bale installed <br /> including mob/demob <br /> �fl <br /> 25 $ �, /bale $7 Straw Bales with rebar per bale installed <br /> 25 ,bale <br /> RiP Rap,Per s $ / Co <br /> including mob/�b ns,instal <br /> 00 <br /> 7a Rip Flap.per spscifwaiions,installed 25 $ � / � $ /�0() <br /> 25 $ •oc $ <br /> GRAND TOTAL <br /> $��L31p.Oo <br /> `For bid evaluation only, quantities are NOT guaranteed <br /> Contractor E}-N-I t2.o N t A <br /> r Date <br /> Signature <br /> Phone 70 - 5 -r,160 <br /> Address I S 17 P-01 <br /> o t Tax ID# 4qL:['30��``ff <br /> T� <br /> THIS B1D SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />