Laserfiche WebLink
COAL BASIN/1999 RUN-OFF MAINTENANCE <br /> BID SCHEDULE <br /> PKA-9-1061 <br /> Item Description Quantity* Unit Price Total Cost <br /> (Estimated <br /> total units) <br /> 1 D7H Dozer/215 FHP equivalent w/operator <br /> including mob/demob 8 $ 385.00 /hr $ 3080.00 <br /> 1a D7H Dozer/215 FHP equivalent w/operator 24 $ 135.00 /hr $ 3240.00 <br /> 2 416B backhoe/loader or 62 FHP equivalent 117.50 940.00 <br /> w/operator including mob/demob 8 $ /hr $ <br /> 2a 416B backhoe/loader or 62 FHP equivalent <br /> w/operator 24 $ 55.00 /hr $ 1320.00 <br /> 3 10 cubic yard on/off highway dump truck 55.00 440.00 <br /> w/operator including mob/demob 8 $ /hr $ <br /> 3a 10 cubic yard on/off highway dump truck <br /> w/operator 8 $ 55.00 /hr $ 440.00 <br /> 4 12G motor grader or 135 FHP equivalent <br /> w/operator including mob/demob 8 $ 137.50 /hr $ 1100.00 <br /> 4a 12G motor grader or 135 FHP equivalent <br /> w/operator 16 $ 75.00 /hr $ 1200.00 <br /> 5 Prefabricated silt fence per lineal foot installed <br /> including mob/demob 100 $ 8.001 Ft $ 800.00 <br /> 5a Prefabricated silt fence per lineal foot installed <br /> 100 $ 6.0LFt, $ 600.00 <br /> 6 Straw Bales with rebar per bale installed <br /> including mob/demob 25 $ 15.O%ale $ 375.00 <br /> 6a Straw Bales with rebar per bale installed 25 $ 7.O%ale $ 175.00 <br /> 7 Rip Rap, per specifications, installed <br /> including mob/demob 25 $ 60.0(y�3 $ 1500.00 <br /> 7a Rip Rap, per specifications, installed 25 $ 60.0 d3 $ 1500.00 <br /> GRAND TOTAL $16,710.00 <br /> *For bid evaluation only, quantities are NOT guaranteed <br /> Contractor Beavers Construction Company Date February 24, 1999 <br /> Signatures ��). Phone970-872-2323 <br /> Address PO Box 638 <br /> Paonia, CO 81428 TaxID#84-0926213 <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />