Laserfiche WebLink
Division of Minerals and Geology <br /> General Conditions for Purchase Orders <br /> 1. DEFINITIONS <br /> OWNER OR STATE-The Director of the State of Colorado, <br /> Division of Minerals and Geology(DMG)or his designee. The <br /> Colorado Division of Minerals and Geology(DMG)is located at 3. AWARD <br /> 1313 Sherman Street, Room 215, Denver, Colorado, 80203, <br /> telephone(303)866-3567. Award will be made with reasonable promptness, by written <br /> notice to the low responsive and responsible bidder whose bid <br /> PROJECT MANAGER-The Director of the Colorado Division meets the requirements and criteria set forth in the Invitation for <br /> of Minerals and Geology or the DMG employee or Bid. These criteria will include, but not be limited to the lowest <br /> representative responsible for day to day observation of project GRAND TOTAL PRICE, corrected if necessary for errors in <br /> work at the job site,and general contract administration for the price extension and/or addition, and capability to meet the <br /> DMG. performance time requirements. The GRAND TOTAL PRICE <br /> will be used for comparing bids only. <br /> CONTRACTOR OR SELLER - The sole proprietorship, <br /> partnership, or corporation to which the Purchase Order is 4. INSURANCE <br /> addressed. <br /> The Contractor is required to procure and maintain the <br /> PURCHASE ORDER CONTRACT DOCUMENTS - An insurance coverage listed below. Proof of insurance must be <br /> enforceable contract in that it is written evidence of the submitted on certificates showing the following minimum <br /> purchaser's acceptance of the seller's previous and unretracted coverage- <br /> offer to perform the work subject of the purchase order for the <br /> price stated therein. The Purchase Order Contract indudes the 1. Standard Worker's Compensation and Employer <br /> Bid, bid Schedule,General Conditions, Insurance Certificates, Liability, as required by State Statute including <br /> Purchase Order Terms and Conditions, Bid Solicitation occupational disease, covering all employees at the <br /> Memorandum, including Work Description, maps, drawings work site. <br /> and any Amendments These documents are complementary; <br /> what is called by for any one document shall be as binding as 2. General Liability (Public Liability & Property <br /> if called for by all. Damage)(Minimum): <br /> In case of a difference between the contract documents, a. Combined single limit of$600,000 written on <br /> precedence shall be given in the following respective order: an occurrence basis; <br /> bid, Bid Solicitation memorandum, General Conditions, b. Any aggregate will not be less than $1 <br /> Purchase Order Term s and Conditions, maps and Drawings, Million; <br /> Amendments shall take precedence in the area of the bid C. The contractor must purchase additional <br /> document which they modify or clarify. In the case of any such insurance if claims reduce the annual <br /> difference,the matter shall be promptly brought to the attention aggregate below$600,000; <br /> of the PROJECT MANAGER who will make a determination in d. The State of Colorado must be named as <br /> wring. additional insured on each comprehensive <br /> general liability policy; <br /> WORK-The material and/or labor the seller is to furnish to the e. Certificates of insurance must be provided to <br /> purchaser by operation under the purchase order. the State within 10 working days after <br /> receipt of Award; and, <br /> SUBCONTRACTOR - A sole proprietorship, partnership or f. Insurance shall include provisions providing <br /> corporation which has a contract with the CONTRACTOR for notification to the State 10 days prior to <br /> the performance of labor at the site of the work regardless of cancellation of the coverage. <br /> whether supplying of material is part of such contract, but <br /> without contractual relationship to the purchaser. 3. Automobile Liability(Minimum). The contractor must <br /> carry a minimum of$600,000 combined single limit. <br /> SUPPLIER-A sole proprietorship, partnership or corporation <br /> which over-the-counter or under contract furnished the The State of Colorado MUST be named as an Additional <br /> CONTRACTOR material or equipment incorporated in the work Insured on the certificate of insurance. An Additional Insured <br /> or otherwise incident to the CONTRACTOR'S performance, Endorsement amending such policy or policies must be <br /> but which performs no labor at the work site. presented to the DMG prior to issuance of the Notice to <br /> Proceed. Bidders are advised to consult with their <br /> 2. CONDITIONS AFFECTING THE WORK insurance carrier concerning these requirements. Submit <br /> a bid only if you are prepared to complete these <br /> In addition to examining the drawings and specifications, requirements. <br /> completion schedule, and other instructions, bidders shall visit <br /> the site and take such other steps as may be reasonably 5. WORK SCHEDULE <br /> necessary to ascertain the nature and location of the work, <br /> including average climatic conditions and the general and local After a Purchase Order has been issued, the PROJECT <br /> conditions which can affect the work or the cost thereof. MANAGER will notify the Contractor. Under no circumstances <br /> Failure to do so will not relieve bidders from responsibility for shall the CONTRACTOR begin work before a P.O. is issued. <br /> estimating properly the difficulty or cost of successfully If the Bid Solicitation Memorandum specifies project dates or <br /> performing the work. a certain project schedule,the successful bidder shall perform <br /> the work during the specked time period. DMG reserves the <br />