during completion of Task 10, Topsoil Application, Surface Roughening, are not <br /> damaged or destroyed. <br /> r <br /> The CONTRACTOR will supply the fertilizer (commercial), mulch, and equipment for <br /> chiseling, fertilizer application, seeding, mulching and crimping. Revegetation efforts <br /> will occur on approximately aaaa (aa) acres, which includes the areas located on the <br /> north east and eastern slope of the Old Refuse Pile, subject to activities undertaken <br /> during performance of Task 6, Earth Work, and the topsoil stockpile locations(s). <br /> Broadcast application of seed and fertilizer and hand mulching and crimping is <br /> preferred. Hydro seeding and hydro mulching is acceptable. If hydro seeding and <br /> hydro mulching is selected, the seed and fertilizer will be applied in a first application, <br /> and the mulch applied in a second, separate application. Seed application rate is <br /> specified on Table 1, Mine Site Seed Mixture, attached. <br /> If road surfaces are seeded by broadcast methods, seed must be worked into the soil <br /> by dragging implements across the ground surface after seeding, or by other suitable <br /> means. <br /> Measurement and Payment <br /> Measurement and payment for this Task will be as per Revegetation Specification 20.0. <br /> Revegetated areas will be measured to the nearest 0.1 acre and paid at the unit price <br /> bid on the Bid Schedule Item 11. The price bid shall include all costs for labor, <br /> materials, equipment and all other items necessary for revegetation as described in <br /> these specifications, including work on the Old Refuse Pile and at the Sutey Topsoil <br /> Stockpile. Payment for this task will be made only for the unit price shown under Item <br /> 11 of the Bid Schedule. Payment shall be as this task is completed and approved by <br /> the PROJECT MANAGER. <br /> TASK 12 POST CONSTRUCTION SEDIMENT CONTROL <br /> Silt fence may be placed at various locations to minimize the transportation of sediment from the <br /> facility. Placement of silt fencing, if required, will occur concurrently with, or immediately upon <br /> completion of top soiling operations. Up to 1,500 feet of silt fence may be installed during <br /> completion of this project. Silt fences will be Mirafi Prefabricated Silt Fence with Posts, or <br /> approved equivalent (Figure ww, Typical Silt Fence). Silt fence will be installed as per <br /> manufacturers specifications. <br /> Measurement and Payment <br /> Silt fence will be measured to the nearest linear foot. Payment for this task will be paid for at <br /> prices established in Item 12 of the Bid Schedule per linear foot installed. Installation of 1,000 <br /> feet of silt fence IS NOT guaranteed. Such payment shall be considered full compensation for all <br /> labor, materials, equipment and all other items necessary and incidental to the furnishing and <br /> placement of the silt fences as directed and described in the specifications. Payment will be as <br /> this task is completed and approved by the PROJECT MANAGER. Payment for this task will be <br /> made only for the unit price shown under Item 12 of the Bid Schedule. <br /> 22 <br />