Laserfiche WebLink
Total acres <br />Sunnyside Gold Corp <br />Total acres <br />M -1977 -378 <br />Total acres <br />Sunnyside Gold Mine <br />Total acres <br />San Juan <br />backfilled: <br />$633.00 <br />seeded w/ <br />131..t,4, <br />w /topsoil <br />1448.793- /5'q, if <br />mulched w/ <br />IOC) <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />I 3/-2- (' <br />fertilized w/ <br />1 a. L <br />replacement <br />rate (tons): <br />1 Ti,/ <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />M el,-o s o Pt_.( 0....4 <br />Fertilizer <br />w 41 d „_p a1 , d <br />Mulch <br />1J Ctre, r-C,C/ <,_..., d <br />application <br />% <br />� <br />application <br />RA c } <br />application <br />( <br />method: <br />r-c A ctCa 3 <br />method: <br />"' ° 5 <br />method: <br />Permittee Name: <br />Sunnyside Gold Corp <br />Permit Number: <br />M -1977 -378 <br />Operation Name: <br />Sunnyside Gold Mine <br />County: <br />San Juan <br />Annual Fee Due: <br />$633.00 <br />Anniversary Date: <br />June 10, 2012 <br />Permit Acreage: <br />1448.793- /5'q, if <br />Current Bond Amt: <br />$60,534.00 <br />112 Annual Report <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). O NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? ES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES <br />b) approval for INTERMITTENT OPERATION? YES <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). 131 . 2_4 <br />8. Number of acres that were newly affected during the current report year. 0 <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />0 <br />CD <br />Page 2 of 3 <br />4 I9QI <br />YES <br />