Laserfiche WebLink
2012 -05 -20 23:17 DAMS <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />nl2 <br />tO1oir$2n3 <br />@ 31/li eaiftl6r <br />1% <br />y1; <br />Permit Acreage: <br />Total acres <br />graded: <br />Seed <br />application <br />method: <br />Morgan County Government <br />Vaned Pit <br />$791.00 <br />68.70 <br />seeded w/ <br />approved mix: <br />Total acres <br />fertilized w/ <br />aped fertilizer: <br />P B t./ t_, <br />► <br />3038328106 » <br />Fertilizer <br />application <br />method: <br />9705423569 <br />STATE OF COLORADO, <br />112c Annual Report <br />Permit Number: <br />County: <br />Anniversary Date: <br />Current Bond Amt: <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />According to C.R.S. 34- 32.5 -116 or 34-32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). C) NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />5. Does the mine operate more than 180 days per year <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. <br />9_ Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />I 1. Estimated acres to be reclaimed in the next report year_ <br />12. Total acres in various stages of reclamation, since permitted minim activities began: <br />Total acres Total acres / Total acres Total acres <br />backfilled: 4. w /topsoil � j mulched w/ <br />Office of <br />Mined Land Reclamation Denver + Grand Junction • Durango <br />replaced: approved mulch: <br />Topsoil Mulch application <br />replacement rate (tons): <br />depth (in.): <br />Mulch <br />application <br />method: <br />MINING <br />M -1979 -210 <br />Moran <br />Ma 4, 2012 <br />$0.00 <br />/2 -f/ <br />COLORADO <br />D I V T S 1 U N <br />RECLAMATION <br />P 2/2 <br />YES NO <br />NO <br />Office of <br />Alive and Inactive Mines <br />