Laserfiche WebLink
Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fPm) <br />Travel <br />(min) <br />1 <br />10000.00 <br />3.00 <br />3.00 <br />6.00 <br />1855 <br />5.437 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fPm) <br />(min) <br />1 <br />10000.00 <br />-3.00 <br />3.00 <br />0.00 <br />2938 <br />3.429 <br />Truck/Loader Worksheet Cont'd <br />Haul Route: <br />Task # 767 <br />Return Route: <br />Haul Time: <br />5.437 <br />minutes <br />Return Time: <br />3.429 <br />minutes <br />Total Truck Cycle Time: 10.934 minutes <br />Page 3 of 3 <br />Loading Tool unit <br />Production 431.33 LCY /Hour Adjusted for job efficiency: 358.00 LCY/Hour <br />Truck Unit Production <br />46.09 LCY /Hour Adjusted for job efficiency: 38.26 LCY /Hour <br />Optimal No. of Trucks: 9 Truck(s) Selected Number of Trucks: 5 Truck(s) <br />Adjusted hourly truck team production: 191.28 LCY/Hour <br />Adjusted single truck/loader team production: 191.28 LCY/Hour <br />Adjusted multiple truck/loader team production: 191.28 LCY /Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 1.36 Hours <br />Unit cost: $4.423 /LCY Total job cost: $1,150.04 <br />CIRCES Cost Estimating Software <br />