Laserfiche WebLink
1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.903 <br />(CAT HB) <br />0.950 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Bulldozer Worksheet Cont'd Task # 738 <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Total job time: <br />Total job cost: <br />Net correction: 0.3853 <br />4 Dozer(s) <br />$0.609 /LCY <br />3.45 Hours <br />$2,945.18 <br />350.82 LCY /hr <br />1403.28 LCY /hr <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />