My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-09_REVISION - C1980007 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2011-10-09_REVISION - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:54 PM
Creation date
6/12/2012 3:01:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
10/9/2011
Doc Name
Reclamation Cost Estimate (Part 3 of 3)
From
DRMS
Type & Sequence
RN6
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: West Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Agency or organization name' Division of Reclamation, Mining and Safety <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $213.59 <br />Total Fleet Cost/Hour: $85435 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />724 State: Colorado <br />7/5/2011 County: Gunnison <br />TAK <br />19,365 <br />1.125 <br />21,786 LCY <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Replace tops on pads and roads, MR - 267, 270, 273 and 275 <br />Cat D9R - 9SU (2005) <br />405 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />$57.16 <br />$110.89 <br />$7.05 <br />$38.49 <br />Source of estimated volume: Division estimate <br />Source of estimated swell factor: Cat Handbook <br />Average push gradient: 0 % <br />Average site altitude: 7,000 feet <br />Material weight: 2,550 lbs /LCY <br />100 feet <br />1,243.2 LCY /hr <br />Weight description: Earth - Dry packed <br />BULLDOZER WORK <br />Permit Action: Permit Renewal RN- <br />06 <br />Consolidated stockpile 1.0 <br />0.750 <br />1.000 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />Page 1 of 2 <br />Permit/Job #: C 1980007 <br />Abbreviation: None <br />Filename: C007 -724 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.