Laserfiche WebLink
Task description: <br />Site: West Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />225 <br />9/14/2011 <br />TAK <br />Agency or organization name' <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: <br />- Loader: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost/hour: $784.44 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />Truck/Loader Team <br />17,776 <br />17,776 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />Material Purchase Cost: <br />Total Cost: <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,550 <br />Description: Earth - Dry packed <br />Rated Payload: 35,400 <br />Payload Capacity: 13.88 <br />TRUCK/LOADER TEAM WORK <br />Remove RPEE road surfacing, haul to main surface facilities <br />State: <br />County: <br />Permit Action: Permit Renewal RN- <br />06 <br />Colorado <br />Gunnison <br />Division of Reclamation, Mining and Safety <br />Equipment Description <br />Generic 10 -12 cy, 6x4 <br />CAT 966G (2002) <br />Cat D9R - 9SU (2005) <br />Cat D9R - 9SU (2005) <br />NA <br />NA <br />CCY <br />LCY <br />Pounds <br />LCY <br />Support Eauinment <br />Pounds /LCY <br />Swell factor: 1.000 <br />3.03 miles X 30 ft wide X 1 ft thick <br />Cat Handbook <br />$0.00 <br />$0.00 <br />Abbreviation: None <br />Page 1 of 3 <br />Permit/Job #: C 1980007 <br />Filename: C007 -225 <br />Shift basis: 1 per day <br />Maintenance Eauinment <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />100 <br />100 <br />NA <br />NA <br />Ownership cost/hour: <br />$12.25 <br />$27.48 <br />$57.16 <br />$57.16 <br />NA <br />NA <br />Operating cost/hour: <br />$49.41 <br />$44.65 <br />$110.89 <br />$110.89 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$7.05 <br />$7.05 <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$38.49 <br />$38.49 <br />$38.49 <br />NA <br />NA <br />Unit Subtotals: <br />$61.66 <br />$110.62 <br />$213.59 <br />$213.59 <br />NA <br />NA <br />Number of Units: <br />4 <br />1 <br />1 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: $357.26 <br />Support: $427.18 <br />Maint: $0.00 <br />Task description: <br />Site: West Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />225 <br />9/14/2011 <br />TAK <br />Agency or organization name' <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: <br />- Loader: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost/hour: $784.44 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />Truck/Loader Team <br />17,776 <br />17,776 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />Material Purchase Cost: <br />Total Cost: <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,550 <br />Description: Earth - Dry packed <br />Rated Payload: 35,400 <br />Payload Capacity: 13.88 <br />TRUCK/LOADER TEAM WORK <br />Remove RPEE road surfacing, haul to main surface facilities <br />State: <br />County: <br />Permit Action: Permit Renewal RN- <br />06 <br />Colorado <br />Gunnison <br />Division of Reclamation, Mining and Safety <br />Equipment Description <br />Generic 10 -12 cy, 6x4 <br />CAT 966G (2002) <br />Cat D9R - 9SU (2005) <br />Cat D9R - 9SU (2005) <br />NA <br />NA <br />CCY <br />LCY <br />Pounds <br />LCY <br />Support Eauinment <br />Pounds /LCY <br />Swell factor: 1.000 <br />3.03 miles X 30 ft wide X 1 ft thick <br />Cat Handbook <br />$0.00 <br />$0.00 <br />Abbreviation: None <br />Page 1 of 3 <br />Permit/Job #: C 1980007 <br />Filename: C007 -225 <br />Shift basis: 1 per day <br />Maintenance Eauinment <br />CIRCES Cost Estimating Software <br />