Laserfiche WebLink
Structure or Item <br />Description <br />Dimensions <br />Demolition Menu <br />Selection <br />Quantity <br />Unit <br />Unit <br />Cost <br />Total Cost <br />Sylvester Gulch Fan - <br />Superstructure <br />120x20x10 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />24,000.00 <br />CF <br />$0.18 <br />$4,392.00 <br />-Floor <br />120x20 <br />Demo. and on -site <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />50 ft. push <br />2,400.00 <br />SF <br />$3.19 <br />$7,656.00 <br />- Footings <br />2x3 <br />Demo. and on -site <br />disposal in existing pit, <br />2.O ft. x 3 ft. - Max. 200 <br />ft. push <br />280.00 <br />LF <br />$18.82 <br />$5,269.60 <br />Shaft #3 - Collar <br />12x 12x2 <br />Pavement, concrete, <br />demolition only, 7 in. to <br />24 in. thick - Reinforced <br />10.60 <br />CY <br />$112.00 <br />$1,187.20 <br />- Screen enclosure <br />12x12x6 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />864.00 <br />CF <br />$0.18 <br />$158.11 <br />- Concrete barriers <br />15x10 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />64.00 <br />CF <br />$0.18 <br />$11.71 <br />Emergency escape <br />capsule facility- <br />Buiilding <br />10x16x10 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />1,600.00 <br />CF <br />$0.18 <br />$292.80 <br />- Foundation <br />6x6 <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />36.00 <br />SF <br />$1.61 <br />$57.96 <br />Ventilation facility <br />intake shaft - Collar <br />34 ft diam x 15 <br />in th <br />Pavement, concrete, <br />demolition only, 7 in. to <br />24 in. thick - Reinforced <br />4.00 <br />CY <br />$112.00 <br />$448.00 <br />- Collar base /footer <br />43x40x4.0 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />255.00 <br />CF <br />$0.18 <br />$46.67 <br />- Exhaust shaft collar <br />28 diam. x 12 <br />in th <br />Demo. and on -site <br />disposal in existing pit, <br />12 in. thick - Max. 200 <br />ft. push <br />88.00 <br />SF <br />$3.14 <br />$276.32 <br />- Base /footer <br />34x42x4 <br />Pavement, concrete, <br />212.00 <br />CY <br />$112.00 <br />$23,744.00 <br />DEMOLITION WORK <br />Task description: Demolish /remove structures: Slyvester G., Shaft #3, Syl. G. <br />Permit Action: Permit Renewal RN- <br />Site: West Elk Mine 06 Permit/Job #: C1980007 <br />PROJECT IDENTIFICATION <br />Task #: 301 State: Colorado <br />Date: 6/3/2011 County: Gunnison <br />User: TAK <br />UNIT COSTS <br />Agency or organization name' DRMS <br />Abbreviation: None <br />Filename: C007 -301 <br />Location adjustment: 91.30 % <br />