Laserfiche WebLink
Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />(min) <br />1 <br />7920.00 <br />5.00 <br />5.00 <br />10.00 <br />1068 <br />7.429 <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />(min) <br />1 <br />7920.00 <br />-5.00 <br />5.00 <br />0.00 <br />2938 <br />2.721 <br />Truck/Loader Worksheet Cont'd <br />Haul Route: <br />Task # 228 <br />Return Route: <br />Haul Time: <br />Return Time: <br />7.429 <br />2.721 <br />minutes <br />minutes <br />Total Truck Cycle Time: 12.218 minutes <br />Page 3 of 3 <br />Loading Tool unit <br />Production 542.24 LCY /Hour Adjusted for job efficiency: 450.06 LCY /Hour <br />Truck Unit Production <br />51.86 LCY /Hour Adjusted for job efficiency: 43.04 LCY /Hour <br />Optimal No. of Trucks: 10 Truck(s) Selected Number of Trucks: 4 Truck(s) <br />Adjusted hourly truck team production: 172.16 LCY /Hour <br />Adjusted single truck/loader team production: 172.16 LCY /Hour <br />Adjusted multiple truck/loader team production: 172.16 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 206.50 Hours <br />Unit cost: $2.369 /LCY Total job cost: $84,239.07 <br />CIRCES Cost Estimating Software <br />