My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-09_REVISION - C1980007 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2011-10-09_REVISION - C1980007 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:54 PM
Creation date
6/12/2012 2:58:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
10/9/2011
Doc Name
Reclamation Cost Estimate (Part 2 of 3)
From
DRMS
Type & Sequence
RN6
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br />Task description: Grade topsoil replaced on RPEE <br />Permit Action: Permit Renewal RN- <br />Site: West Elk Mine 06 Permit/Job #: C1980007 <br />PROJECT IDENTIFICATION <br />Task #: 222 State: Colorado <br />Date: 8/29/2011 County: Gunnison <br />User: TAK <br />Agency or organization name DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14H <br />Ripper Attachment: Multi -Shank Ripper <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Unit cost: $91.41 per acre <br />$38.08 <br />$53.14 <br />$3.21 <br />$24.47 <br />$118.90 <br />Total Fleet Cost/Hour: $118.90 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Job Condition Correction Factors Site Altitude: 6300 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.85 (lsh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: 1.3008 acres /Hour <br />Adjusted Hourly Fleet Production: 1.3008 acres /Hour <br />Total job cost: $914.00 <br />Abbreviation: None <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 10.00 acres <br />Source of estimated acreage: Assume 10 acres remain upon bond forfeiture <br />Filename: C007 -222 <br />Horsepower: 215 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />HOURLY PRODUCTION <br />Average Grader Speed: 1.25 mph <br />Selected Application: Finish grading (0 -2.5 mph) - 1.25 <br />Selected Blade Angle: 30 degrees <br />Effective Blade Length: 12.10 feet <br />Width of blade overlap per pass: 2.00 feet <br />Net grading or ripping width per pass: 10.10 feet <br />Unadjusted Hourly Unit Production: 1.5303 acres /hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 7.69 Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.