Laserfiche WebLink
Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 <br />5200.00 <br />-7.20 <br />3.00 <br />-4.20 <br />2938 <br />1.825 <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(flpm) <br />Travel <br />(min) <br />1 <br />5200.00 <br />7.20 <br />3.00 <br />10.20 <br />1768 <br />2.951 <br />Truck/Loader Worksheet Cont'd <br />Haul Route: <br />Task # 029 <br />Return Route: <br />Haul Time: <br />Return Time: <br />1.825 <br />2.951 <br />Total Truck Cycle Time: 6.844 <br />Unit cost: $2.692 /LCY Total job cost: $34,825.66 <br />minutes <br />minutes <br />minutes <br />Page 3 of 3 <br />Loading Tool unit <br />Production 443.65 LCY/Hour Adjusted for job efficiency: 368.23 LCY /Hour <br />Truck Unit Production <br />75.74 LCY /Hour Adjusted for job efficiency: 62.86 LCY /Hour <br />Optimal No. of Trucks: 6 Truck(s) Selected Number of Trucks: 5 Truck(s) <br />Adjusted hourly truck team production: 314.32 LCY /Hour <br />Adjusted single truck/loader team production: 314.32 LCY /Hour <br />Adjusted multiple truck/loader team production: 314.32 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 41.16 Hours <br />CIRCES Cost Estimating Software <br />