718
<br />719
<br />720
<br />721
<br />722
<br />723
<br />724
<br />725
<br />726
<br />727
<br />728
<br />729
<br />730
<br />731
<br />732
<br />733
<br />734
<br />735
<br />736
<br />737
<br />738
<br />739
<br />740
<br />741
<br />742
<br />743
<br />745
<br />746
<br />747
<br />748
<br />749
<br />750
<br />751
<br />752
<br />753
<br />754
<br />755
<br />756
<br />757
<br />758
<br />759
<br />760
<br />Replace topsoil to pads, mudpits, and roads, MR-
<br />214
<br />DOZER
<br />v v v v v v -1 v
<br />1.55
<br />Regrade borehole access roads, MR -218
<br />DOZER
<br />10.29
<br />Regrade MR -218 borehole access roads
<br />DOZER
<br />1.52
<br />Replace topsoil on drill pads and roads, MR -218
<br />DOZER
<br />5.92
<br />Rip pads and roads: MR -267, 270, 273, and 275
<br />RIPPER
<br />7.25
<br />Regrade drill pads and roads, MR -267, 270, 273
<br />and 275
<br />DOZER
<br />26.96
<br />Replace tops on pads and roads, MR -267, 270,
<br />273 and 275
<br />DOZER
<br />9.75
<br />Regrade drill pads: MR -291 and 295, TR -94 and
<br />96
<br />DOZER
<br />47.64
<br />Regrade light use roads: MR -291 and 295, TR -94
<br />and 96
<br />DOZER
<br />64.14
<br />Replace t.s. stckpl. to drill pads: MR- 291,295;
<br />TR -94, 96
<br />DOZER
<br />17.61
<br />Replace topsoil f/stockpile to roads: MR- 291,295;
<br />TR -94, 96
<br />DOZER
<br />24.61
<br />Regrade MR -302 drill pads
<br />DOZER
<br />5.15
<br />Regrade MR -302 roads
<br />DOZER
<br />5.70
<br />Replace topsoil f/stockpile to MR -302 drill pads
<br />DOZER
<br />3.93
<br />Replace topsoil f/stockpile to MR -302 roads
<br />DOZER
<br />4.59
<br />Regrade MR -306 drill pads
<br />DOZER
<br />6.52
<br />Regrade MR -306 light use roads
<br />DOZER
<br />9.22
<br />Replace topsoil f/stockpile to drill pads, MR -306
<br />DOZER
<br />1.92
<br />Replace topsoil f/stockpile to light -use roads, MR-
<br />306
<br />DOZER
<br />2.66
<br />Regrade drill pads, TR -100
<br />DOZER
<br />10.18
<br />Replace topsoil f/stockpile to drill pads, TR -100
<br />DOZER
<br />3.45
<br />Regrade drill pad and light use road, MR -319
<br />DOZER
<br />0.32
<br />Regrade 0.45 -acre drill pad approved MR -320
<br />DOZER
<br />0.13
<br />Regrade 1 -acre drill pad and 200' x 30' road, MR-
<br />321
<br />DOZER
<br />0.60
<br />Regrade drill pad for three 23HG2E wells, MR-
<br />322
<br />DOZER
<br />0.58
<br />Regrade drill pad, MR -324
<br />DOZER
<br />0.28
<br />Regrade drill pads for wells 24GHG2E37XC,
<br />A &B, MR -326
<br />DOZER
<br />0.28
<br />Regrade two drill pads and 600' X 12', A &B, MR-
<br />327
<br />DOZER
<br />0.56
<br />Regrade drill pads, MR -231
<br />DOZER
<br />0.10
<br />Regrade roads, MR -231
<br />DOZER
<br />1.10
<br />Rip storage area prior to seeding, TR -106
<br />RIPPER
<br />0.20
<br />Regrade drill pads of 15 MDWs approved in MR-
<br />334
<br />DOZER
<br />19.23
<br />Regrade light -use roads, MR -334
<br />DOZER
<br />1.78
<br />Rip roads and well pads in MR -342
<br />RIPPER
<br />3.19
<br />Regrade roads and drill pads, MR -342 (2007 AOP)
<br />DOZER
<br />9.20
<br />Rip 0.5 -acre MDW well pad approved, MR -343
<br />RIPPER
<br />0.23
<br />Regrade MDW 25 -11.5 drill pad
<br />DOZER
<br />0.07
<br />Rip MDW pads approved TR -111
<br />RIPPER
<br />2.11
<br />Rip MDW roads, TR -111
<br />RIPPER
<br />2.54
<br />Regrade MDW pads, TR -111
<br />DOZER
<br />6.43
<br />Regrade roads, TR -111
<br />DOZER
<br />7.71
<br />Rip roads , MR -352 holes (holes not approved in
<br />RIPPER
<br />0.01
<br />Cost Summary Worksheet Cont'd
<br />Task # AAA
<br />Page 6 of 8
<br />$1,328.33
<br />$8,789.51
<br />$1,302.41
<br />$5,060.61
<br />$6,200.00
<br />$23,036.78
<br />$8,332.21
<br />$40,700.12
<br />$54,795.25
<br />$15,049.18
<br />$21,025.29
<br />$4,398.24
<br />$6,082.00
<br />$3,360.98
<br />$3,919.97
<br />$5,570.84
<br />$7,877.56
<br />$1,641.08
<br />$2,274.33
<br />$8,694.35
<br />$2,945.18
<br />$274.07
<br />$108.38
<br />$514.71
<br />$495.90
<br />$240.64
<br />$240.93
<br />$481.57
<br />$87.26
<br />$938.82
<br />$172.00
<br />$16,433.22
<br />$1,516.65
<br />$2,726.00
<br />$7,857.62
<br />$199.00
<br />$60.70
<br />$1,810.00
<br />$2,172.00
<br />$5,489.56
<br />$6,589.72
<br />$12.00
<br />CIRCES Cost Estimating Software
<br />
|