Laserfiche WebLink
Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />(min) <br />1 <br />1000.00 <br />5.00 <br />5.00 <br />10.00 <br />1768 <br />0.575 <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 <br />1000.00 <br />-5.00 <br />5.00 <br />0.00 <br />2938 <br />0.426 <br />Truck/Loader Worksheet Cont'd <br />Haul Route: <br />Task # 028 <br />Return Route: <br />Haul Time: <br />0.426 <br />minutes <br />Return Time: <br />0.575 <br />Total Truck Cycle Time: 3.069 <br />minutes <br />minutes <br />Loading Tool unit <br />Production 443.65 LCY /Hour Adjusted for job efficiency: 368.23 LCY /Hour <br />Truck Unit Production <br />168.89 LCY/Hour Adjusted for job efficiency: 140.18 LCY /Hour <br />Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: 3 Truck(s) <br />Adjusted hourly truck team production: 420.53 LCY /Hour <br />Adjusted single truck/loader team production: 368.23 LCY /Hour <br />Adjusted multiple truck/loader team production: 368.23 LCY /Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 88.82 Hours <br />Unit cost: $2.238 /LCY Total job cost: $62,221.80 <br />Page 3 of 3 <br />CIRCES Cost Estimating Software <br />