My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-09_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2011-10-09_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:54 PM
Creation date
6/12/2012 2:37:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
10/9/2011
Doc Name
Reclamation Cost Estimate (Part 1 of 3)
From
DRMS
Type & Sequence
RN6
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Backfill/regrade Pond MB -4 (Loadout Pond) <br />Permit Action: Permit Renewal RN- <br />Site: West Elk Mine 06 <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Attachment 1: <br />Cost Breakdown: <br />Fleet size: <br />012 State: Colorado <br />7/13/2011 County: Gunnison <br />TAK <br />Agency or organization name: DRMS <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Cat 330C L <br />ROPS Cab <br />$37.65 <br />$63.06 <br />$38.67 <br />$139.39 <br />Total Fleet Cost/Hour: $139.39 <br />MATERIAL QUANTITIES <br />Initial volume: 130 <br />Loose volume: 151 <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty): <br />Load Bucket Capacity <br />Rated Capacity: <br />Bucket Fill Factor: <br />Adjusted Capacity: <br />Job Condition Correction Factors <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />JOB TIME AND COST <br />Unit cost: <br />Source of estimated volume: <br />Source of estimated swell factor: <br />1 <br />1.00 <br />0.83 <br />0.83 <br />HYDRAULIC EXCAVATOR WORK <br />Permit Volume 8A, Exhibit 66 <br />Cat Handbook <br />2.25 <br />0.850 <br />1.91 <br />CCY <br />LCY <br />Basic Job Condition Description: <br />Secondary Job Condition within Basic Description: <br />Cycle Time Value: <br />Source <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />Utilization % <br />NA <br />100 <br />NA <br />294.23 <br />244.21 <br />244.21 <br />Excavator Total job time: <br />$0.571 /LCY Total job cost: <br />Horsepower: <br />Weight (MT): <br />Shift Basis: <br />Data Source: <br />Swell factor: 1.165 <br />LCY (heaped) <br />Hard, tough clay (80% - 90 %) 0.850 <br />LCY <br />Site Altitude: 6300 feet <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Permit/Job #: C1980007 <br />Abbreviation: None <br />BELOW AVERAGE <br />SEVERE <br />0.390 <br />Bucket Size Class: Medium <br />0.62 <br />$86.00 <br />Filename. C007 -012 <br />244 <br />33.72 <br />1 per day <br />(CRG) <br />minutes <br />Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.