Laserfiche WebLink
Hazardous waste <br />disposal <br />5 <br />Dumpsite disposal <br />charge - Average <br />5.00 <br />TON <br />$290.00 <br />$1,450.00 <br />Barrel storage area <br />(expansion) - structure <br />46x39x16 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />28,704.00 <br />CF <br />$0.18 <br />$5,252.83 <br />-Floor <br />46X39 <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />1,794.00 <br />SF <br />$1.61 <br />$2,888.34 <br />- Footers <br />1.5x3 <br />Demo. and on -site <br />disposal in excavated <br />pit, 1.5 ft. x 3 ft. - Max. <br />200 ft. push <br />18.00 <br />LF <br />$14.47 <br />$260.46 <br />- Curbs, ramps, sump <br />wall and sump pad <br />13x13 (2) <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />338.00 <br />SF <br />$1.77 <br />$598.26 <br />-Fence <br />124 if <br />Fencing, chain link, <br />including posts and <br />fabric - 8 ft. to 10 ft. <br />high <br />124.00 <br />LF <br />$2.74 <br />$339.76 <br />Hydraulic <br />compressor building- <br />Structure <br />18x25x45 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />6,300.00 <br />CF <br />$0.18 <br />$1,152.90 <br />-Floor <br />18x25 <br />Demo. and on -site <br />disposal in excavated <br />pit, 8 in. thick - Max. <br />200 ft. push <br />450.00 <br />SF <br />$2.14 <br />$963.00 <br />- Footings <br />1 <br />Demo. and on -site <br />disposal in excavated <br />pit, 1.0 ft. x 2 ft. - Max. <br />200 ft. push <br />86.00 <br />LF <br />$6.43 <br />$552.98 <br />Containment <br />structure- walls, floor, <br />curb <br />34x4 <br />Demo. and on -site <br />disposal in excavated <br />pit, 8 in. thick - Max. <br />200 ft. push <br />136.00 <br />SF <br />$2.36 <br />$320.96 <br />Water tank- <br />Superstructure <br />28x86 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />162,637.00 <br />CF <br />$0.18 <br />$29,762.57 <br />-Steel ring for <br />foundation <br />270 cf <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />270.00 <br />CF <br />$0.18 <br />$49.41 <br />Shower trailer <br />12x40x10 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />4,800.00 <br />CF <br />$0.18 <br />$878.40 <br />Shower trailer <br />12x40x10 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />4,800.00 <br />CF <br />$0.18 <br />$878.40 <br />Materials storage <br />building- <br />Superstructure <br />130x30x17 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />64,350.00 <br />CF <br />$0.18 <br />$11,776.05 <br />-Floor <br />130x30 <br />Demo. and on -site <br />1,300.00 <br />SF <br />$2.14 <br />$2,782.00 <br />Demo Worksheet Cont'd <br />Task # TTT <br />Page 13 of 19 <br />CIRCES Cost Estimating Software <br />