My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-09_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2011-10-09_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:54 PM
Creation date
6/12/2012 2:37:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
10/9/2011
Doc Name
Reclamation Cost Estimate (Part 1 of 3)
From
DRMS
Type & Sequence
RN6
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Footings <br />2 ft X 3 ft X <br />434 if <br />Demo. and on -site <br />disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. 200 <br />ft. push <br />434.00 <br />LF <br />$18.82 <br />$8,167.88 <br />Garage - <br />Superstructure <br />57 ft X 33 ft X <br />14ft <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />26,334.00 <br />CF <br />$0.18 <br />$4,819.12 <br />-Floor <br />57 ft X 33 ft <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />1,881.00 <br />SF <br />$1.61 <br />$3,028.41 <br />Loading/unloading <br />dock - Floor <br />5 ft X 10 ft X 8 <br />in <br />Floor, concrete, <br />demolition only, 8 in. <br />thick - No reinforcing <br />500.00 <br />SF <br />$5.64 <br />$2,820.00 <br />-Walls <br />20 ft X 8 ft <br />Demo. and on -site <br />disposal in excavated <br />pit, 8 in. thick - Max. <br />200 ft. push <br />360.00 <br />SF <br />$2.36 <br />$849.60 <br />Bulk fuel storage <br />building - <br />Superstructure <br />73 ft X 39 ft X <br />23ft <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />65,841.00 <br />CF <br />$0.18 <br />$12,048.90 <br />-Floor <br />73 ft X 39 ft X <br />15 in <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />2,847.00 <br />SF <br />$1.61 <br />$4,583.67 <br />- Containment wall <br />10 ft X 437 ft <br />X 6 in <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />4,370.00 <br />SF <br />$1.77 <br />$7,734.90 <br />Maintenance shop - <br />Superstructure <br />181 ft X 61 ft <br />X 30ft <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />331,230.00 <br />CF <br />$0.18 <br />$60,615.09 <br />-Stem walls <br />464 ft X8 ft X <br />8 in <br />Demo. and on -site <br />disposal in excavated <br />pit, 8 in. thick - Max. <br />200 ft. push <br />3,712.00 <br />SF <br />$2.36 <br />$8,760.32 <br />- Footings <br />3 ft X 2 ft <br />Demo. and on -site <br />disposal in excavated <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft. push <br />316.00 <br />LF <br />$19.30 <br />$6,098.80 <br />Barrel storage yard - <br />floor <br />25 ft X 25 ft X <br />6 in <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />625.00 <br />SF <br />$1.61 <br />$1,006.25 <br />-Walls <br />75 ft X 6 in H <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />38.00 <br />SF <br />$1.77 <br />$67.26 <br />-Fence <br />75 ft L X 8 ft <br />H <br />Fencing, chain link, <br />including posts and <br />fabric - 8 ft. to 10 ft. <br />high <br />75.00 <br />LF <br />$2.74 <br />$205.50 <br />Heated storage - <br />Walls <br />56 ft X 8 in H <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />38.00 <br />SF <br />$1.77 <br />$67.26 <br />Demo Worksheet Cont'd <br />Task # TTT <br />Page 2 of 19 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.