Laserfiche WebLink
8. Task 2, Earth Work: Two conveyor belt line tunnels daylighted about half way up the north facing slope <br /> behind the coal refuse pile. The corrugated metal cover over the two tunnels was cut back into the hill <br /> slope, and the tunnels have been partially backfilled. There is some potential that the tunnel remnants <br /> could be intercepted during excavation of the hill. Any metallic materials will be disposed of off site, and <br /> any concrete encountered will be disposed of as described in Task 2,Demolition. It is thought that if these <br /> tunnels are encountered,unnecessary delays or complications will not be experienced. If this is incorrect, <br /> appropriate accommodations may be negotiated between the CONTRACTOR and PROJECT <br /> MANAGER. <br /> 9. All terms and conditions of the Invitation and Bid other than as changed by this amendment <br /> remain the same. <br /> 10. Receipt and acceptance of this amendment shall be acknowledged on the bid form. <br />