Laserfiche WebLink
COAL BASIN MINE/FACILITIES AREA RECLAMATION PROJECT <br /> REVISED BID SCHEDULE <br /> P KA-0-449 <br /> Item Description Qty. Unit Unit Price Amount <br /> 1 Mobilization/Demobilization N/A Job N/A $ 7,000.00 <br /> 2 Demolition N/A Job N/A $ 1,750.00 <br /> 3 Culvert Removal N/A Job N/A $ 10,000.00 <br /> 4 Road Grading <br /> B Lower Sutey Access Road <br /> Segment 1 950 Ln. Ft. $ 5.75 $ 5,462.50 <br /> Segment 2 950 Ln. Ft. $ 5.7, $ 5,462.50 <br /> C Belt Line Transfer Road 450 Ln. Ft. $ 5.25 $ 2,362.50 <br /> D North West Sutey Access Road 300 Ln. Ft. $ 2.20 $ 660.00 <br /> E Road A 5,800 Ln. Ft. $ .65 $ 3,770.00 <br /> 5 Rolled Dip Construction 2 Dip $ 80.00 $ 160.00 <br /> 6 Low Water Crossing 2 Crossing $ 270.00 $ 540.00 <br /> 7 Surface Channels <br /> A Old Coal Storage Area 150 Feet $ 1.50 $ 225.00 <br /> B Rock Dump Channel 350 Feet $ 2.15 $ 752.50 <br /> 8 Earth Work N/A Job N/A $ 50,000.00 <br /> 9 Topsoil Application and Surface <br /> Roughening N/A Job N/A $ 41,000.00 <br /> 10 Revegetation 15.6 Acre $ 1,855.00 $ 28,938.00 <br /> 11 Post Construction Sediment <br /> Control 1,000 Ln. Ft. $ 1.70 $ 1,700.00 <br /> 12 Equipment Rental <br /> A Dozer 24 Hour $ 75.00 $ 11800.00 <br /> B Backhoe 24 Hour $ 60.00 $ 1,440.00 <br /> C End Dump Truck 16 Hour $ 50.00 $ 800.00 <br /> GRAND TOTAL $ 163,823.00 <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />