My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-08-23_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1999-08-23_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2021 10:35:45 PM
Creation date
6/12/2012 9:45:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
8/23/1999
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COAL BASIN MINE/FACILITIES AREA RECLAMATION PROJECT <br /> REVISED BID SCHEDULE <br /> PKA-0-449 <br /> Item Description Qty. Unit Unit Price Amount <br /> 1 Mobilization/Demobilization N/A Job N/A $ 24, 927. 12 <br /> 2 Demolition N/A Job N/A $ 2,465. 21 <br /> 3 Culvert Removal N/A Job N/A $ 6, 682.79 <br /> 4 Road Grading <br /> B Lower Sutey Access Road <br /> Segment 1 950 Ln. Ft. g 3.99 ¢ 3, 786.91 <br /> Segment 2 950 Ln. Ft. $ 10. 16 $ 9, 652. 92 <br /> C Belt Line Transfer Road 450 Ln. Ft. $ 1 0. 8 2 $ 4, 871 .01 <br /> D North West Sutey Access Road 300 Ln. Ft. $ 4. 69 $ 1 , 395.96 <br /> E Road A 5,800 Ln. Ft. $ 0. 83 $ 4, 811 .51 <br /> 5 Rolled Dip Construction 2 Dip $ 1 48. 51 $ 297.01 <br /> 6 Low Water Crossing 2 Crossing $ 371 . 27 _ $ 742. 53 <br /> 7 Surface Channels <br /> A Old Coal Storage Area 150 Feet $ 3. 17 $ 475. 22 <br /> B Rock Dump Channel 350 Feet $ 2. 29 $ 801 . 93 <br /> 8 Earth Work N/A Job N/A $ 1 3, 169. 58 <br /> 9 Topsoil Application and Surface <br /> Roughening N/A Job N/A $ 48 , 041 . 82 <br /> 10 Revegetation 15.6 Acre $ 1 , 840. 19 $ 2 6, 314. 6 9 <br /> 11 Post Construction Sediment <br /> Control 1,000 Ln. Ft. $ 4.46 $ 4,455. 19 <br /> 12 Equipment Rental <br /> A Dozer 24 Hour $ 60.00 $ 1 ,440.00 <br /> B Backhoe 24 Hour $ 60.00 $ 1 ,440.00 <br /> C End Dump Truck 16 Hour $ 99.00 $ 880.00 <br /> GRAND TOTAL $ 1 9h, 847. 0 <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.