Laserfiche WebLink
u <br /> Facilities Area project to do (October 4) V 4 <br /> Remove tires,debris and trash from project area <br /> Remove road E CMP,including sediment control during construction <br /> Mope road A at 2%to the inside ditch <br /> Build low water crossing on Road A at coal storage area <br /> Build drainage ditch at coal storage area to drain to low water crossing <br /> Rock all low water crossings to specifications <br /> Put 12 inches cover and 6 additional inches of soil over coal at west of refuse pile area <br /> Put 6 inches of soil at east of Road A area—be careful of my flagged survey points—rip before soiling <br /> Roughen all areas per specifications Refuse gets dozer bumps,cut slope behind and slope at old coal <br /> storage get traGMee divots <br /> �•r <br /> Blend slopes at old coal storage area by old buried cistern <br /> When done with all earthwork,put up silt fence along Road A on refuse pile. Maintain silt fence above <br /> coal creek as necessary <br /> Machine time—at coal storage area B (Near upper low water crossing)distribute stockpiled topsoil on <br /> landslide,roughen and revegetate <br /> Weld up gate on Road A above lamp house <br /> � 6 r0' <br />