Laserfiche WebLink
COAL BASIN MINE/FACILITIES AREA RECLQS1M TION PROJECT <br /> REVISED BID SCHEDULE <br /> PKA-0-449 <br /> Item Description Qty. Unit Unit Price Amount <br /> 1 Mobilization/Demobilization NIA Job NIA 5 10 ,400 . 00 <br /> 2 Demolition NIA Job NIA <br /> $ 2 , 500 .00 <br /> 3 Culvert Removal N/A Job N/A $ 2 , 5 0 0 .0 0 <br /> 4 Road Grading <br /> B Lower Sutey Access Road <br /> Segment 1 950 Ln. Ft $ 3 . 00 $ 2 , 850 .00 <br /> Segment 2 950 Ln. Ft $ 1 . 32 $ 1 , 75-4 .70 <br /> C Belt Line Transfer Road 450 Ln. Ft $ 2 .00 $ 900 .00 <br /> D North West Sutey Access Road 300 Ln. Ft $ 1 .00 $ 3 0 0 .0 0 <br /> E Road A 5,800 Ln. Ft $ . 30 $ 1 ,740 .00 <br /> 5 Rolled Dip Construction 2 Dip $ 120 .00 $ 240 .00 <br /> 6 Low Water Crossing 2 Crossing $ 5 0 . 0 0 $ 700 .00 <br /> 7 Surface Channels <br /> A Old Coat Storage Area 150 Feet $ . 75 $ 112 .50 <br /> B Rock Dump Channel 350 Feet $ .75 $ 262 . 50 <br /> 8 Earth Work N/A Job N/A $ 91000 .00 <br /> 9 Topsoil Application and Surface <br /> Roughening N/A Job NIA $ 3 5 , 0 0 0 .0 0 <br /> 10 Revegetation 15.6 Acre $_650 . 0o $ 10 , 14 0 .0 0 <br /> 11 Post Construction Sediment 1 . 25 1 , 250 .00 <br /> Control 1,000 Ln. Ft $ $ <br /> 12 Equipment Rental <br /> A Dozer 24 Hour $ 60 .00 $ 1 ,440 .00 <br /> B Backhoe 24 Hour $ 44 . 00 $ 1 , 056 .00 <br /> C End Dump Truck 16 Hour $ 0 .0 0 $ 480 .00 <br /> GRAND TOTAL $ 8 2 , 12 5 .0 0 <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 oil 1 Page <br />