Laserfiche WebLink
FIELD DIRECTIVE COLORADO MINED LAND <br /> RECLAMA710N DtviStON <br /> 1313 Sherman.SL,RM 215 <br /> Denver,CO 80203-2273 <br /> Project name (303)866-3567 <br /> 71 P S e g e G r r� rro�v Date U _Y y <br /> Contractor name Bid# <br /> 2T — N — -7 _aA✓ -'— <br /> 99 <br /> Contractor address PO# <br /> /�W s- / 7 041 A-� <br /> G O/7�f— Ca/G/L �/�G% /S 9 Req# <br /> Project Manager <br /> e- t.r- �� Field Directive# 4 <br /> Use this form to authorize work changes due to"changed conditions within the scope of the Purchase Order Contract. Field <br /> directives resulting in increased Contract price or Completion time must be approved by a formal Change Order within 14 days. <br /> The following changes are authorized at the direction of the PROJECT MANAGER: <br /> ITEM No. DESCRIPTION OF CHANGES $ Increase/Decrease <br /> l C Cat— S RL-C r <br /> / <br /> T t <br /> Net change in Contract price 7$ Net change in Contract time <br /> 7 S v n= <br /> Days <br /> This document shall become an amendment to the Contract.All Contract provisions shall apply. <br /> Approved by: <br /> ✓/ /���. --�'_—'--- Date' � <br />