Laserfiche WebLink
REVISED EID SCH.E�UE <br /> F Ka. -4 3�. <br /> Item Description I Quantity I Unit I Unit Frice I Amcunt <br /> `1 q <br /> 13 I Additional Demolition I N/A I Jcb <br /> 14 Additional Earn <br /> Wcr'.� N/A Job <br /> 15 Additional Channel <br /> Construction <br /> A Main Channel 3,400 Ln. Ft. S �'� $ <br /> B West Feeder 850 Ln. Ft $ $_, m <br /> oa <br /> C East Feeder 600 Ln. Ft <br /> 16 Additional Road o0 <br /> Reclamation N/A Job N/A w 00•- <br /> 17 Additional Topsoil and $ <br /> Surface Roughening N/A Job N/A <br /> 18 Additional Revegetation 5.6 Ac. s <br /> 5 <br /> 0•,0 <br /> 19 Additional Tree Planting 640 Stem <br /> 20 Additional Post o0 <br /> Construction Sediment 700 Ft s 5 $ 5a5 <br /> Control <br /> Alternative Topsoil <br /> 21 Application and Surface N/A Job N/A $ <br /> Roughening <br /> -7 co 00 <br /> 22 Alternative Revegetation 9 Ac. ( �' <br /> GRAND TOTAL <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Pace 2 cf 2 Paces <br />