Laserfiche WebLink
XCEL Tempora <br /> Erosion Control roducts <br /> INSTALLATION INSTRUCTIONS <br /> Each XCEL, Erosion Control Blanket should be installed blanket when using the Regular style blanket. It MA be <br /> over a properly prepared, fertilized, seeded area. Make necessary to overlap, dig check slots, anchor ditches or <br /> sure the blanket is in contact with the soil over the entire hury the ends of the blanket when the application is <br /> area. NORMALLY, it is not necessary to overlap, dig more demanding particularly when using the Superior <br /> check slots, anchor ditches or bury the ends of the and Super Duty style blankets. <br /> Procedure REGULAR R1 SUPERIOR S2 SUPER DUTY SD3 <br /> 1 Remove outer wra er: <br /> 2 Start-unrolling blanket: <br /> 3 Mat'in contact with soil: • • <br /> A Excelsior • <br /> B Nettin • • <br /> 4 Secure blanket with staples: • <br /> Sloe Installation • • <br /> 1 Rolled vertically down slope: • <br /> 2 Secured 3' be and crest of slo e: • • <br /> 3 Follow staplepattern: • <br /> 2' 2' 2' <br /> 1 Horizontal across blanket: 3 2t <br /> 2 Vertical down blanket: 31 <br /> 4 Approximate sta les er blanket: 120 120 100 <br /> 1 4' blanket 120 120 <br /> 2 8' blanket <br /> Channel Installation • • <br /> 1 Roll blanket in same direction of water flow: • <br /> 2 Adjacent blankets overla2ped 3" minimum: • <br /> 3 End and be inning of rolls overlapped at least 611: • • <br /> 4 Staking check slots with back filling.. • • <br /> 5 Follow sta lepattern: • <br /> 2' 2' <br /> 2' <br /> 1 Horizontal across blanket: 31 <br /> 31 2' <br /> 2 Vertical down blanket: <br /> 6 A roximate sta les per blanket: 120 120 120 <br /> 1 4' blanket 120 <br /> 2 8' blanket 120 <br /> Shoreline Installation • • <br /> 1 install above highest normal splash zone: • <br />