My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-05-26_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1995-05-26_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 10:27:16 PM
Creation date
6/8/2012 1:32:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
5/26/1995
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Installation Guide <br /> Anchoring - <br /> Methods <br /> General "_- <br /> Overlapping = 4 = t.. ` • " <br /> Side overlap 2" End overlap 6" Check slot <br /> Al" <br /> Slopes Channels <br /> • Grade and smooth slope. Apply fertilizer and seed Grade and smooth channel. Apply fertilizer and <br /> prior to installing blankets. seed prior to installing blankets. <br /> • Anchor blankets at top of slope. Use anchoring • Anchor blankets at top of channel ("B"). Backfill <br /> method"A"for 4:1 slopes, "B"for 3:1 slopes and"C" with check slot material. For culvert outfalls, place <br /> for 2:1 and steeper slopes. blanket at least 12 inches upstream from pipe open- <br /> 9 Unroll blankets in direction of water flow. Place ing. <br /> blankets loosely and in full contact with the soil. • Install a blanket in the center of the channel, in the <br /> • Overlap blanket edges approximately 2" and direction of water flow. Additional blankets are <br /> staple. Note: install blankets so edge overlaps are installed at the edges of this center blanket. <br /> shingled away from prevailing wind. • Construct check slots with soil, gravel, or stone, in <br /> • Overlap blanket ends 6",upper blanket over lower the middle (45 ft.) and end of each blanket. <br /> blanket, and staple using five staples (anchor "A") • Overlap side channel blanket edges 4" over the <br /> • Cut excess blanket with scissors and anchor at end center channel blanket and staple. <br /> of slope. Use anchoring method "A" for 4:1 slopes • Anchor the top edge of side channel blankets("B"). <br /> and "B" for slopes 3:1 or steeper. • Anchor the terminal ends of blankets in a check slot. <br /> Shorelines <br /> • Grade and smooth channel. Apply fertilizer and <br /> seed prior to installing blankets. ' <br /> • Install blankets during lowest possible water level. ` <br /> • Install blankets horizontally along shoreline if one <br /> j" <br /> width is sufficient. Al,-. t _ <br /> • Secure top edge of blanket("B"). '` <br /> • Overlap blanket ends and staple ("A"). <br /> • Anchor bottom edge of blanket ("B"). <br /> • For shorelines steeper than 3:1 slope, install blan- <br /> kets vertically using slope instructions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.