Laserfiche WebLink
~ Coal Basin / Sutey and Old Refuse Piles Reclamation Project <br /> C-81-017 <br /> BID SCHEDULE <br /> Task Description Qty. Unit Unit price Amount <br /> 1 Mobilization/Demobilization per 1 Job N/A $10,000.00 <br /> specifications <br /> 2 Silt Fence, Installed 2,000 Ln. Ft. $ 1.25 $ 2,500.00 <br /> 3 Earth Work, per specifications <br /> a Sutey Pile Grading and 1 Job $ 61,920.00 $61,920.00 <br /> Topsoiling <br /> b Old Refuse Pile Grading and 1 Job $27F970.00 $27f070.o0 <br /> Topsoiling <br /> 4 Surface Drainages, per <br /> specifications <br /> a Ditch 1 3,300 Ln. Ft. $ 5.60 $18,480.00 <br /> b Ditch 2 675 Ln. Ft. $ 3.30 $ 2,227.5 <br /> c Ditch 3 625 Ln. Ft. $ 3.30 $ 2,062.50 <br /> d Ditch 4 700 Ln. Ft. $ 3.30 $ 2,310.0 <br /> e Ditch 5 1 ,025 Ln. Ft. $ 3.30 $ 3,382.5 <br /> f Ditch 6 1 ,300 Ln. Ft. $ 3.30 $ 4,290.0 <br /> g Ditch 7 1 ,200 Ln. Ft. $ 3.30 $ 3,960.00 <br /> n Ditch 8 800 Ln. Ft. $ 5.60 $ 4,480.0n <br /> i Spring Conveyance 300 Ln. Ft. $ 2_nn $ 6nn-nn <br /> j Sutey Stream Diversion 1 ,240 Ln. Ft. $ 7.65 $ 9,486.00 <br /> 5 Equipment Rental (if required) <br /> a Bulldozer, per specifications 40 'Hours $ 71.75 $ 2,870.00 <br /> b Backhoe Loader, per 20 <br /> specifications Hours $ 70.00 $ 1,400.00 <br /> c 5 cubic yard on/off highway 10 Hours $ 4R_nn $ 480_nn <br /> dump truck <br /> 6 Revegetation, per specifications 22 Acres $950.00 $20,900.00 <br /> 7 Additional Silt fence, installed, if 800 Ln. Ft. $ 1.25 $ 1,000.00 <br /> required <br /> GRAND TOTAL (Enter here and on Bid) $ 180,318.50 <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />