Laserfiche WebLink
JUN 19 '95 08:05AM DIV/MINERALS&GEOLOGY P.3r5 <br /> coal Basin / Sutey and Old Refuse Piles Reclamation Project <br /> c-81-017 <br /> BID SCHEDULE <br /> Task Description Qty. Unit Unit price Amount <br /> 1 Mobilization/Demobilization per 1 Job NIA $10,000.00 <br /> specifications <br /> 2 Silt Fence, installed 2,000 Ln, Ft. $ 1�25 $ 2,500.00 <br /> 3 Earth Work, per specifications <br /> a Sutey Pile Grading and 1 Job $ 61_ ,920.00 $61,920.00 <br /> Topsoiling <br /> b Old Refuse Pile Grading and 1 Job $ 23,9-M.00 $77 7n-00 <br /> Topsoiling <br /> 4 Surface Drainages, per <br /> specifications <br /> a Ditch 1 3,300 Ln. Ft. $ 5-60 $18,480_00 <br /> b Ditch 2 675 Ln. Ft. $ 3.30 $ 2,227.50 <br /> c Ditch 3 -625 Ln, Ft. $---L.30 $ 2,062-50 <br /> d Ditch 4 700 Ln. Ft. $ 3.30 $ Z,310.0 <br /> e Ditch 5 1,02-5 Ln. Ft. $ 3.30 $ 3,382.5 <br /> f Ditch 6 1,300 Ln. Ft. $ 3.30 $ 4,,290.00 <br /> g Ditch 7 1,200 Ln, Ft. $ 3�30 $. 3,960.0 <br /> h Ditch 8 800 Ln. Ft. $ K_an_ $ 4.480.O� <br /> i Spring Conveyance 300 Ln. Ft. $ 2_nn $ 600_nn <br /> j Sutey Stream Diversion 1,240 Ln. Ft. $ 7.65 $ �00 <br /> 5 Equipment Rental (if required) <br /> a Suildozer, per specifications" 40 Hours $ 71-75 $ 2,870.00 <br /> b Backhoe Loader, per 20 70.00 1,400.00 <br /> specifications Hours $ $ <br /> c 5 cubic yard on/off highway 10 Hours $ as -nn $ 49o_0n <br /> dump truck <br /> 6 Revegetation, per specifications 22 Acres $950-00 $20,900.00 <br /> 7 Additional Silt fence, installed, if 800 Ln. Ft. $ 1-25 $ 1,000-00 <br /> required <br /> GRAND TOTAL (Enter here and on Bid) $ 180,318.50 <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />