Laserfiche WebLink
Coal Basin / Sutey and Old Refuse Piles Reclamation Project <br /> C-81-017 <br /> BID SCHEDULE <br /> Task Description Qty. Unit Unit price Amount <br /> 1 Mobilization/Demobilization per 1 Job N/A $ <br /> specifications <br /> 0 <br /> 2 Silt Fence, Installed 2,000 Ln. Ft. $ SQQD°"- <br /> 3 Earth Work, per specifications <br /> a Sutey Pile Grading and 1 Job $aLenoo� $ `7c) <br /> Topsoiling <br /> b Old Refuse Pile Grading and 1 Job $ <br /> Topsoiling <br /> 4 Surface Drainages, per <br /> specifications <br /> as <br /> a Ditch 1 3,300 Ln. Ft. $ $ rl <br /> b Ditch 2 675 Ln. Ft. $ $ /i5-o— <br /> c Ditch 3 625 Ln. Ft. $ 2 S t;K 6O � <br /> d Ditch 4 700 Ln. Ft. $ $ <br /> e Ditch 5 1 ,025 Ln. Ft. $ `.� $ O <br /> f Ditch 6 1,300 Ln. Ft. $ $ .2(nn <br /> g Ditch 7 1 ,200 Ln. Ft. $ S�� $ <br /> h Ditch 8 800 Ln. Ft. $ �{ $ 2,60` <br /> i Spring Conveyance 300 Ln. Ft. $ 2 op— $ 6 once <br /> j Sutey Stream Diversion 1,240 Ln. Ft. $ $ <br /> 5 Equipment Rental (if required) <br /> a Bulldozer, per specifications 40 Hours $ $ $ /S3 <br /> b Backhoe Loader, per 20 F,er <br /> specifications Hours $ <br /> c 5 cubic yard on/off highway 10 Hours $ $ <br /> dump truck _ <br /> 6 Revegetation, per specifications 22 Acres $ 10,50 - $ /O°E- <br /> 7 Additional Silt fence, installed, if 800 Ln. Ft. $_ $ <br /> required <br /> GRAND TOTAL (Enter here and on Bid) $ <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />