My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-10-13_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1995-10-13_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 5:18:54 PM
Creation date
6/8/2012 1:16:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
10/13/1995
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS <br /> Coal Basin Sutey Pile and Old Refuse Pile Reclamation Project <br /> PKA-5-356 <br /> PROJECT LOCATION <br /> The project is located four miles west of Redstone in Pitkin County, Colorado. The mine is <br /> accessed via a paved service road (Map 1, General Location Map). <br /> WORK SUMMARY <br /> The project will be conducted on a mine site previously permitted by the State of Colorado <br /> Division of Minerals and Geology. The site was active as an underground mining operation <br /> from 1953 until 1991. The Colorado Mined Land Reclamation Board revoked the mining <br /> permit and forfeited the reclamation bond. The disturbances created as a result of activities <br /> at the site since August 3, 1977 are the subject of the reclamation activities addressed in this <br /> and subsequent Invitation to Bid documents. <br /> The project work will include some final grading work, construction or reconstruction or <br /> channels, and distribution of topsoil at the Sutey Refuse Disposal Area and the Old Refuse <br /> Pile. All areas disturbed during these construction activities will be revegetated. <br /> PRE-BID MEETING AND SITE SHOWING <br /> A mandatory pre-bid meeting and site showing will begin at the Coke Ovens at the south <br /> turnoff to Redstone on State Highway 133. This mandatory meeting will begin on <br /> June 1 , 1995 at 10:00 a.m. (Map 2, Pre-Bid Meeting Location). <br /> The Pre-Bid Meeting is for the purpose of showing prospective bidders the work site and <br /> vicinity. Bidders are advised to be prompt. A sign-in sheet will be available at the Pre-Bid <br /> meeting for firms to register their attendance. It is the bidder's responsibility to make certain <br /> their attendance is recorded on the sign-in sheet. Failure to sign-in or to attend the entire <br /> meeting may be cause for rejection of a bid. <br /> Bidders are cautioned that,notwithstanding any remarks or clarifications given at this meeting <br /> and site showing, all terms and conditions of the contract documents remain unchanged <br /> unless they are changed by written amendment issued by the OWNER. If the answers to <br /> questions, or any amendment to the contract documents create ambiguities, it is the <br /> responsibility of the bidder to seek clarification prior to submitting a bid. <br /> BID OPENING DATE <br /> The bid opening date for this project is June 16, 1995, at 2:30 p.m. <br /> All bid openings are open to the public and bidders are welcome to attend and record the bid <br /> results. A written tabulation of the Bid results will be available to those bidders who submit <br /> a self-addressed, stamped envelope with their bid. Please allow two weeks for receipt of Bid <br /> results. Telephone requests cannot be honored because of time constraints. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.