My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-10-13_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1995-10-13_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 5:18:54 PM
Creation date
6/8/2012 1:16:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
10/13/1995
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOGUE CONSTRUCTION, NC. <br /> P O- Box 400 <br /> Fruity CO 81521 <br /> Telephone (970)858-3108 <br /> Fax (970)858-3139 <br /> OCTOBER 20, 1995 RFOR V E�v ` ' D <br /> State of Colorado OCT 2 31995 <br /> Division of Minerals & Geology Bivrr , )F <br /> 1313 Sherman Street, Room 215 MINERALS n(q <br /> Denver, CO 80203 <br /> Pr:;ject Narne: Coal Basin/Sutey Pile <br /> Project No.: PKA-5-356 <br /> Payment Re ues02 <br /> Task Description Quantity Unit Price This Draw Total This Draw Total <br /> Complete Complete Amount Amount <br /> 1 Mobilization 1 $10,000.00 50'/ 100% $5,000.00 S 10,000.00 <br /> Sutey Fence, 2,000 LF $1. ` 800 LF 1,600 LF $1,000.00 S2,000.00 <br /> Installed 17v ���� /��Y ,�� '.��5 /✓ � <br /> 3 EARTHWORK <br /> 3a Sutey Pile 1 $61,920.00 35% 100% $21,672.00 $61,920.00 <br /> Grading and <br /> Topsoiling <br /> 3b Old Refuse Pile 1 $27,970.00 75% 100% $20,977.50 $27,970.00 <br /> Grading and <br /> Topsoiling <br /> 4 DRAINAGES <br /> 4a Ditch 1 3,300 LF $5.60 3,165 LF 3,165 LF $17,724.00 $17,724.00 <br /> 4b Ditch 2 675 LF $3.30 700 LF 700 LF $2,310.00 $2,310.00 <br /> 4c Ditch 3 625 LF $3.30 700 LF 700 LF $2,310.00 $2,310.00 <br /> 4d Ditch 4 700 LF ?, G" 350 LF 350 LF <br /> 4e Ditch 5 1,025 LF $3.30 400 LF 400 LF $1,320.00 $1,320.00 <br /> 4f Ditch 6 1,300 LF $3.30 700 LF 700 LF $2,310.00 $2,310.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.