Laserfiche WebLink
BULLDOZER WORK <br />Task description: Replace Topsoil from Stockpile to RDH -4 Pad <br />Site: Deserado Mine Permit Action: Minor Revision 151 Permit /Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 254 <br />Date: 6/8/2012 <br />User: JRS <br />5% <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi - Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown <br />Utilization % <br />Ownership Cost/Hour: <br />$72.40 <br />NA <br />Operating Cost/Hour: <br />$140.68 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $251.56 <br />Total Fleet Cost/Hour: $251.56 <br />MATERIAL OUANTITIES <br />Initial Volume: 750 <br />Swell factor: 1..125 <br />Loose volume: 844 LCY <br />Source of estimated volume: <br />Source of estimated swell factor <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description <br />State: Colorado <br />County: Rio Blanco <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />100 feet <br />1,243.2 LCY/hr <br />Consolidated stockpile 1.0 <br />5.500 feet <br />2,550 lbs/LCY <br />Earth - <br />Abbreviation: None <br />Filename: C018 -254 <br />CIRCES Cost Estimating Software <br />