Laserfiche WebLink
DEMOLITION WORK <br />Task description: <br />Site: Deserado Mine <br />Demolish and Remove Structures Associated with Minor Revision 151 <br />Permit Action: Minor Revision 151 Permit /Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 252 <br />Date: 6/8/2012 <br />User: JRS <br />Agency or organization name: DRMS <br />1111211 KOO7I V <br />Abbreviation: None <br />Filename: 0018 -252 <br />Location adjustment: 98.70 % <br />Structure or Item <br />Dimensions <br />Demolition Menu <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Description <br />Selection <br />Cost <br />Rock Dust Tank <br />8,801 CF <br />Bldg. (MN) demo. /on- <br />8,801.00 <br />CF <br />$0.21 <br />$1,857.01 <br />site disposal in excavated <br />it -Max. 10,000 ft. haul <br />- Pad <br />37.9 CF <br />Pavement, concrete, <br />37.90 <br />CY <br />$112.00 <br />$4,244.80 <br />demolition only, 7 in. to <br />24 in. thick - Reinforced <br />Generator Building <br />8'x12' <br />Bldg. (SN) demo. /on -site <br />960.00 <br />CF <br />$0.18 <br />$175.68 <br />disposal in excavated pit <br />-Max. 10,000 ft. haul <br />-Pad <br />8'xI2'x4" <br />Demo. and on-site <br />96.00 <br />SF <br />$1.07 <br />$102.72 <br />disposal in excavated pit, <br />4 in. thick - Max. 200 ft. <br />push <br />Blower Building <br />6'x12' <br />Bldg. (SN) demo. /on -site <br />720.00 <br />CF <br />$0.18 <br />$131.76 <br />disposal in excavated pit <br />-Max. 10,000 ft. haul <br />-Pad <br />6'xI2'x4" <br />Demo. and on-site <br />72.00 <br />SF <br />$1.07 <br />$77.04 <br />disposal in excavated pit, <br />4 in. thick - Max. 200 ft. <br />push <br />Power Line <br />520 LF <br />Powerline or telephone <br />520.00 <br />LF <br />$2.60 <br />$1,350.96 <br />line, overhead, wood - <br />Single pole <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 40.00 (unadjusted): $7,939.97 location): $7,836.75 <br />State: Colorado <br />County: Rio Blanco <br />CIRCES Cost Estimating Software <br />