My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-08_REVISION - C1981018 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2012-06-08_REVISION - C1981018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:59:47 PM
Creation date
6/8/2012 1:13:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
6/8/2012
Doc Name
Preliminary Adequacy Review Letter & Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR151
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Minor Revision 151 Cost Summary <br />Site: Deserado Mine Permit Action: Minor Revision 151 Permit /Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 250 <br />Date: 6/8/2012 <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />251 <br />252 <br />253 <br />254 <br />255 <br />Plug and Seal Boreholes Associated with MR -151 <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />3.00 <br />$569.04 <br />$7,836.75 <br />$1,101.93 <br />$420.94 <br />$549.53 <br />Demolish and Remove Structures Associated with <br />Minor Revisio <br />DEMOLISH <br />40.00 <br />Rergrade RDH -4 Pad <br />DOZER <br />4.38 <br />Replace Topsoil from Stockpile to RDH -4 Pad <br />DOZER <br />1.67 <br />Reseed RDH -4 Pad <br />REVEGE <br />1.96 <br />SUBTOTALS: <br />51.01 <br />$ 10,478.19 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />25.51 <br />Profit: <br />10.00 <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />$211.66 <br />$110.02 <br />$1,512.45 <br />$1,047.82 <br />$2,881.95 <br />$13,360.14 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />4.61 <br />Total = <br />$615.90 <br />Reclamation management and /or administration: <br />3.58 <br />$478.29 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$3,976.15 <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$14,454.34 <br />State: Colorado <br />County: Rio Blanco <br />Abbreviation: None <br />Filename: C018 -250 <br />
The URL can be used to link to this page
Your browser does not support the video tag.